![]() One-Kilowatt hour equals 1,000 Watt-hours. Kilowatt-hour means the basic unit of electric energy equal to one Kilowatt of power supplied to or taken from an electric circuit steadily for one hour. Off-Peak Hours means those hours which are not On-Peak Hours. Each Peak Period cannot be longer than three hours. Must include at least one hour during the morning commute hours and one during evening commute hours, Monday through Friday. Peak Hours or “Peak Period” means the period with the highest ridership during the entire transit service day as determined by the transit operator. On-Peak Hours means Hour Ending (“HE”) 0800 through HE 2300 EPT, Monday through Friday, excluding Saturday, Sunday and PJM holidays.Ĭlock hour means either of the following: ![]() This bill would also provide that nothing prohibits the department from such takings for public health or safety purposes, the prevention or relief of suffering, or law enforcement purposes. Establish the proposed4 Refer to ODOT interoffice memo dated Decem(from Erik Havig, Region 2 Planning Manager) clarifying the methodology for establishing alternate mobility standards. ![]() In cases where the v/c is forecasted to be ≥1.0 using the Annual Average Weekday PM Peak as the future design hour, determine the duration of the period during which the future Annual Average Weekday PM Peak hour will have a v/c ≥1.0. This includes 4,419 inbound trips and 3,332 outbound trips during the AM Peak hour (08:00 to 09:00) and 6,251 inbound trips during and 8,517 outbound trips during the PM Peak hour (17:00 to 18:00).Īnalysis periods shall be based on the professional judgement of the Department of Transportation which shall consider periods including, but not limited to, Weekday Average Daily Traffic (ADT), AM Peak Hour, and PM Peak hour traffic volumes. Planned action applicants shall pay their proportionate share of improvements based on new PM Peak hour trips. In the PM Peak hour, the collective side-street approach delay at unsignalized intersections [No-Build Option vs. Three key time periods have been assessed – weekday AM Peak hour (0800-0900) and weekday PM Peak hour (1700-1800). To ensure that Project-generated net new PM Peak hour trips remain within the CRA Trip Budget, the City shall maintain an accounting of the Project’s net new PM peak hour trips using the methodology in Exhibit K and an accounting tool consistent with Exhibit K. Peak hour traffic restrictions apply to all signalized intersections and arterial streets.Īnalysis periods shall be based on the professional judgment of the Department of Transportation which shall consider periods including, but not limited to, Weekday Average Daily Traffic (ADT), AM Peak Hour, and PM Peak hour traffic volumes. The Contractor shall observe peak hour traffic restrictions on certain streets between the hours of 7:00 A.M.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |